Advance measurements, a detailed fitting plan, careful preparation and pre-assembly of components in the workshop, all add to this method which makes on-site fitting easy.
Fitting takes 1 to 2 days depending on the difficulty and size of the work.
We show below the steps for the fitting of a fireplace in Bourgogne stone with a Bodart & Gonay Phénix 850 hearth with retractable door and heat recovery. A lit bookshelf is built into the right of the fireplace.
Installation on site |
The hearth with its connections, the walls and the bookshelf in place |
The base, the ash pit, the posts... the fireplace is coming together... |
After the mantelpiece is fitted, the joints are filled |
Everything is in place : insulation, joints, plaster... |
The fireplace is completely installed and the first test is carried out to ensure that it works |
|